Engineer-led migrations
We move your
servers for you.

A written planDependencies reviewed first
Your chosen windowDowntime agreed in advance
A way backRollback planned before cutover
Engineers on the moveManagement after it, too
Start with what you have
A different starting point.
The same careful work.
What you are leaving changes the plan. We work through the reason for the move and the requirements for what comes next.
The cloud
Your traffic is predictable. Your bill should be, too. We review the workload and work out what belongs on dedicated hardware.
Explore cloud repatriationA VMware renewal
Before signing the next licensing quote, look at a move onto managed bare-metal virtualization we run for you.
Plan around the renewalOld hardware
The machine is approaching end of life and spares are getting harder to find. Plan the replacement while you can choose the timing.
Explore bare metalAnother datacenter
A contract ending, a building closing, or a change of plan. We map the dependencies and move the environment with you.
Explore private cloudThe work, in order
Four steps.
Our engineers do the work.
You review the plan and choose the window. We handle the preparation, the move and the checks on the other side.
- 01
Review the setup
We map what runs where, how the services connect and what needs to keep working. The dependencies shape the plan.
- 02
Agree the plan
You see the sequence, checks, expected downtime and rollback plan before committing. We agree the migration window with you.
You approve the window - 03
Make the move
Our engineers carry out the work and stay on the call. We check the applications and data before routing traffic to the new setup.
The agreed cutover window - 04
Keep a way back
The old environment stays in place until the new one is validated. We agree when it is safe to retire it.
Retire only after validation
We agree the expected length of the interruption for your setup before the move.
An agreed interruption
You need a window.
We tell you how long.
Usually minutes. We estimate the downtime after looking at your setup, explain what determines it and agree when it should happen.
The examples here come from individual migrations. Your applications, data and network decide what is possible for yours.
Talk through your moveA running virtual machine · one migration
The full move, with a pause of under a second during the transfer.
A publisher platform · one cutover
The customer-visible window while DNS changed to the new platform.
Past examples, not a service-level guarantee. We confirm the plan for your workload.

More than copying the files
Make sure it runs.
Then make the switch.
For one national publisher, we rebuilt the platform for more traffic as part of the move. Before it received real readers, we tested it with 20,000 simulated users.
After the move
A new home.
The same team on call.
Our hardware, racks and network. The engineering team that moved you keeps looking after what you run.
Before you move
Questions,
answered straight.
Have a specific environment in mind? Tell us what runs on it and what is prompting the move.
Usually a few minutes, but we estimate the window after reviewing your setup. You see it before committing and choose when the move happens.
Your next infrastructure partner
Tell us what
you’re running.
We will tell you how we would move it, what needs preparation, and how long your setup would be down. Start with your current environment.